Scheme for Promotion of Culture of Science: Digital Planetarium/Space And Astronomy Education Centre (Category 1, Category 2 And Category 3): लाभ राशि, पात्रता नियम, आवश्यक दस्तावेज और ऑनलाइन आवेदन प्रक्रिया
In short: The scheme component aims to create awareness about the sky, space and celestial phenomena and to eradicate related superstitions. Capital cost and corpus fund assistance under three categories is provided to State/Union Territory Governments and their Societies.
The scheme component aims to create awareness about the sky, space and celestial phenomena and to eradicate related superstitions. Capital cost and corpus fund assistance under three categories is provided to State/Union Territory Governments and their Societies.
- ##
- योजना का परिचय एवं उद्देश्य (Overview)
Scheme for Promotion of Culture of Science: Digital Planetarium/Space And Astronomy Education Centre (Category 1, Category 2 And Category 3)सरकार द्वारा शुरू की गई एक अत्यंत लाभकारी एवं जनकल्याणकारी योजना है। इसका मुख्य उद्देश्य लक्षित वर्ग को वित्तीय एवं सामाजिक सुरक्षा प्रदान करना, आत्मनिर्भर बनाना और उनके जीवन स्तर को बेहतर बनाना है।
इस योजना के अंतर्गत पात्र नागरिकों को निर्धारित मानकों के अनुसार लाभ दिया जाता है। योजना का संपूर्ण संचालन पर्यटन एवं संस्कृति मंत्रालय, भारत सरकारद्वारा पारदर्शिता के साथ किया जा रहा है।
2. मुख्य विशेषताएं एवं संक्षिप्त विवरण (Key Highlights)
| विवरण | जानकारी |
|---|---|
| योजना का नाम | Scheme for Promotion of Culture of Science: Digital Planetarium/Space And Astronomy Education Centre (Category 1, Category 2 And Category 3) |
| प्रदाता विभाग / मंत्रालय | पर्यटन एवं संस्कृति मंत्रालय, भारत सरकार |
| योजना का स्तर | केंद्रीय खेल एवं सांस्कृतिक प्रोत्साहन |
| लक्षित क्षेत्र / राज्य | अखिल भारतीय (सभी राज्यों के नागरिक) |
| लाभ का प्रकार | नकद पुरस्कार / छात्रवृत्ति / उपकरण सहायता / प्रशिक्षण अनुदान |
| आवेदन प्रक्रिया | ऑनलाइन (आधिकारिक पोर्टल) |
| आधिकारिक पोर्टल | culture.gov.in |
3. मिलने वाले लाभ एवं वित्तीय सहायता (Benefits & Assistance)
इस योजना के तहत स्वीकृत मानकों के अनुसार निम्नलिखित लाभ प्रदान किए जाते हैं:
1. Digital Dome Planetarium — Category 112.0-metre-diameter aluminium dome digital planetarium; Total Built-Up Area: approximately 800 square metres. (₹ In Crore) LocationCapital costCorpus FundTotal Project CostAll locations other than North Eastern Region including Sikkim, Hilly Terrain and Island territories18.005.4023.40North Eastern Region including Sikkim21.606.5028.10Hilly Terrain and Island Territories other than location in North Eastern Region including Sikkim21.606.5028.102. Digital Dome Planetarium — Category 210.0 Metre Diameter Aluminium Dome Digital Planetarium; Total Built Up Area 600 Square Metres approximately. (₹ In Crore)LocationCapital costCorpus FundTotal Project CostAll locations other than North Eastern Region including Sikkim, Hilly Terrain and Island territories10.003.0013.00North Eastern Region including Sikkim12.003.6015.60Hilly Terrain and Island Territories other than location in North Eastern Region including Sikkim12.003.6015.603. Digital Dome Planetarium — Category 310.0 Metre Diameter Aluminium Dome Digital Planetarium; Total Built Up Area 600 Square Metres approximately. (₹ In Crore) LocationCapital costCorpus FundTotal Project CostAll locations other than North Eastern Region including Sikkim, Hilly Terrain and Island territories6.101.857.95North Eastern Region including Sikkim7.302.209.50Hilly Terrain and Island Territories other than location in North Eastern Region including Sikkim7.302.209.50>Conditions Associated with the Benefits:
- Under Type B funding, the capital cost for Digital Planetarium/Space and Astronomy Education Centre Category 1, Category 2 and Category 3 is shared 50:50 for all locations other than North East including Sikkim, and 90:10 for the North Eastern Region including Sikkim. The corpus fund is shared 20:80.
- The Digital Planetarium could be operated and managed under Type A, Type B and Type C, as detailed for science centres.
- Under Type C, the State Governments and Union Territories shall fully fund the project and set it up with technical support from the National Council of Science Museums against payment of consultancy charges.
- The corpus fund shared by the Government of India shall in no case exceed 20 per cent of the total Corpus Fund; the principal shall in no case be utilized for any activity; not more than 85 per cent of the interest can be utilised to meet the operational deficit after inauguration, and a minimum of 15 per cent is to be added back to compensate the inflation on a year to year basis.
- The share of corpus fund of the Government of India and the State Government or Union Territory is to be released upfront after approval of the project and prior to commencement of the works.
- The recurring expenditure will be completely borne by the State Government. Every year, provision for the annual recurring expenditure for maintenance of the equipment and organizing new planetarium shows shall be made by the State Government.
- For Hilly Region, Island Territory and North Eastern Region, 20 per cent extra on the entire Capital Cost has been considered.
- The building construction cost is considered based on normal foundation. If any special foundation is required to be done based on the Soil Test Report, the additional cost will have to be borne by the State Government.
- Escalation of project cost shall be governed by successive cost index over DPAR-2019 as published by the Central Public Works Department at the time of the project work; the extra project cost on this account is to be borne by the State Government or Local Authority.
Content and Facilities Provided:
- Category 1: Main Opto-mechanical Star field Projector capable of projecting 8,500 stars down to 6.5 magnitude on a tilted or horizontal Projection Dome; the Projector will have Space or Earth mode system, or a Full dome digital planetarium projector system, or both, depending upon available fund. Dome Size 12 metre diameter; Seating Capacity 120 to 125 unidirectional. The capital cost includes Civil and allied works ₹4.02 crore; Chairs ₹0.15 crore; Air Conditioning of Planetarium theatre and exhibition areas only ₹0.50 crore; Carpet in planetarium theatre ₹0.06 crore; Firefighting System ₹0.25 crore; Pure Digital Full-dome solution with High Contrast Light Emitting Diode or Solid State light source projection system with effective resolution of 4.5K after blending, including cost of 12.0 Metre Diameter inner Aluminium Dome ₹10.00 crore; Uninterruptible Power Supply ₹0.15 crore; Telescope and accessories for sky observations ₹1.00 crore; Office furniture, furnishing and tools ₹0.25 crore; Exhibits on Astronomy within the circular passage around the planetarium theatre with exhibition space of 350 Square Metres approximately ₹1.00 crore; Transportation, Installation and Commissioning of Exhibits at site ₹0.20 crore; Travelling Allowance or Daily Allowance, Training and Miscellaneous Expenditure ₹0.20 crore; and Architects Fee ₹0.22 crore.
- Category 2: Main Opto-mechanical Star field Projector capable of projecting 8,500 stars down to 6.5 magnitude. Dome Size 10 metre diameter; Seating Capacity 80 to 85 unidirectional. The capital cost includes Civil and allied works ₹3.00 crore; Chairs ₹0.01 crore; Air Conditioning ₹0.35 crore; Carpet ₹0.04 crore; Firefighting System ₹0.20 crore; High Contrast Light Emitting Diode or Solid State light source projection system with effective resolution of 3K after blending ₹3.00 crore; 10 Metre Diameter Inner Aluminium Dome ₹1.25 crore; Uninterruptible Power Supply ₹0.05 crore; Telescope and accessories ₹0.10 crore; Office furniture ₹0.15 crore; Exhibits on Astronomy with exhibition space of 275 Square Metres approximately ₹1.25 crore; Transportation, Installation and Commissioning ₹0.15 crore; Travelling Allowance or Daily Allowance, Training and Miscellaneous Expenditure ₹0.20 crore; and Architects Fee ₹0.16 crore.
- Category 3: Mini Digital Projection System. Dome Size 8 metre diameter; Seating Capacity 50 unidirectional. The capital cost includes Civil and allied works ₹2.22 crore; Chairs ₹0.06 crore; Air Conditioning ₹0.30 crore; Carpet ₹0.02 crore; Firefighting equipment, standalone using portable fire extinguisher ₹0.20 crore; Single projector fish eye lens equipment with effective resolution 2K ₹1.00 crore; 8 Metre Diameter Inner Aluminium Dome ₹1.00 crore; Uninterruptible Power Supply ₹0.05 crore; Telescope and accessories ₹0.06 crore; Office furniture ₹0.10 crore; Exhibits on Astronomy with exhibition space of 200 Square Metres approximately ₹0.75 crore; Transportation, installation and commissioning ₹0.10 crore; Travelling Allowance or Daily Allowance, Training and Miscellaneous expenditure ₹0.12 crore; and Architects Fee ₹0.12 crore.
- Additional Items for Category 1 and Category 2: Special Effect Projectors and Attachments; Complete sound system for the Planetarium Theatre; Projection dome; and Cove lights.
- Additional Facilities for Category 1 and Category 2: Interactive exhibition on astronomy and space science; Activity area for students on astronomy; Sky observation through a Global Positioning System-enabled telescope; Lecture hall for astronomy lectures by specialists; and Office, maintenance workshop, and show development room.
- Additional Facilities for Category 3: Activity area for students on astronomy; Sky observation through a Global Positioning System-enabled telescope; Lecture hall for astronomy lectures by specialists; and Office, maintenance workshop and show development room.
Mode of Disbursement: Normally, the digital planetarium will be set up by the National Council of Science Museums on a turn-key basis, including construction and commissioning of the equipment, and handed over after completion to the State Government or Union Territory. The construction work shall start only after the share or funding is received from the State or Union Territory Government. Preferably, the construction of the building shall be undertaken by the State Government, Union Territory or agency within the allocated budget as per inputs and supervision by the National Council of Science Museums. Frequency of Disbursement — Year-wise Utilization of Capital Expenditure: For all three categories, the capital expenditure is released at 60 per cent in the first year and 40 per cent in the second year.
Category and locationGovernment of India capital shareGovernment of India corpus share (Maximum)Government of India totalUpfront release by State/Union Territory Government prior to starting of the projectCategory 1 — all locations other than North East including Sikkim₹9.00 crore₹1.08 crore₹10.08 crore₹13.32 crore, including minimum corpus share of ₹4.32 croreCategory 1 — North East regions including Sikkim₹19.44 crore₹1.30 crore₹20.74 crore₹7.42 crore, including minimum corpus share of ₹5.20 croreCategory 1 — hilly terrains and island territories other than the above₹10.80 crore₹1.30 crore₹12.10 crore₹16.00 crore, including minimum corpus share of ₹5.20 croreCategory 2 — all locations other than North East including Sikkim₹5.00 crore₹0.60 crore₹5.60 crore₹7.40 crore, including minimum corpus share of ₹2.40 croreCategory 2 — North East regions including Sikkim₹10.80 crore₹0.72 crore₹11.52 crore₹4.08 crore, including minimum corpus share of ₹2.88 croreCategory 2 — hilly terrains and island territories other than the above₹6.00 crore₹0.72 crore₹6.72 crore₹8.88 crore, including minimum corpus share of ₹2.88 croreCategory 3 — all locations other than North East including Sikkim₹3.05 crore₹0.37 crore₹3.42 crore₹4.53 crore, including minimum corpus share of ₹1.48 croreCategory 3 — North East regions including Sikkim₹6.57 crore₹0.44 crore₹7.01 crore₹2.49 crore, including minimum corpus share of ₹1.76 croreCategory 3 — hilly terrains and island territories other than the above₹3.65 crore₹0.44 crore₹4.09 crore₹5.41 crore, including minimum corpus share of ₹1.76 crore>Expected Time of Completion: Completion time from the date of issue of the Letter of Intent for the construction work is 24 months for Category 1, Category 2 and Category 3. The project can be completed within 24 months time from the date of commencement of construction for Category 1, Category 2 and Category 3.
Recurring Expenditure and Projected Revenue:
- Category 1: Recurring expenditure of ₹50,00,000 per annum, comprising ₹30,00,000 salary, ₹15,00,000 maintenance and ₹5,00,000 activities and spares approximately, for operating the planetarium, shall be borne by the agency or society running the Planetarium or by the State Government. Considering 60 per cent occupancy, that is 60 per cent public and 40 per cent students, and 5 shows a day, revenue from tickets would be ₹19.44 lakh per year from the public (60 per cent of 360 persons a day at ₹30 per person for 300 days in a year) and ₹8.64 lakh per year from students (40 per cent of 360 students a day at ₹20 per student for 300 days in a year), totalling ₹28.08 lakh per year.
- Category 2: Recurring expenditure of ₹40,00,000 per annum, comprising ₹25,00,000 salary, ₹10,00,000 maintenance and ₹5,00,000 activities and spares approximately. Revenue from tickets would be ₹13.00 lakh from the public (60 per cent of 240 persons a day at ₹30 per person for 300 days) and ₹5.76 lakh from students (40 per cent of 240 students a day at ₹20 per student for 300 days), totalling ₹18.76 lakh per year.
- Category 3: Recurring expenditure of ₹40,00,000 per annum, comprising ₹25,00,000 salary, ₹10,00,000 maintenance and ₹5,00,000 activities and spares approximately. Revenue from tickets would be ₹8.1 lakh from the public (60 per cent of 150 persons a day at ₹30 per person for 300 days) and ₹3.6 lakh from students (40 per cent of 150 students a day at ₹20 per student for 300 days), totalling ₹11.7 lakh per year.
Validity and Post-Sanction Obligations: The Digital Planetariums and Astronomy Education Centres should strive to achieve the following over a period of 5 years from opening:
- Generate at least 50 per cent of their operating cost.
- Achieve an annual visitors footfall of around 1,00,000 for Category 1 (75,000 for the North East Region), around 75,000 for Category 2 (50,000 for the North East Region), and around 25,000 for Category 3.
- Organize a minimum of 5 to 10 astronomy education programmes in a year.
योजना का मुख्य लक्ष्य लक्षित वर्ग को आत्मनिर्भर बनाना और उनके समग्र आर्थिक व सामाजिक विकास को गति देना है।## 4. योजना की पात्रता शर्तें (Eligibility Criteria)
योजना का लाभ उठाने के लिए आवेदक को निम्नलिखित प्रमुख शर्तों को पूरा करना आवश्यक है:
- The applicant should be a State Government, a Union Territory, or a Society or Authority promoted by the State or Union Territory Government.
- The applicant proposing a Category 1 Digital Planetarium should propose a location fulfilling the criteria for Science Centre – Category 1, that is, a city or town with a population of 15,00,000 or more, and the planetarium shall have a 12 metre dome.
- The applicant proposing a Category 2 Digital Planetarium should propose a location fulfilling the criteria for Science Centre – Category 2, that is, a city or town with a population between 5,00,000 and 15,00,000, and the planetarium shall have a 10 metre dome.
- The applicant proposing a Category 3 Digital Planetarium should propose a location fulfilling the criteria for Science Centre – Category 3, that is, a city, town or location with a population of less than 5,00,000, and the planetarium shall have an 8 metre dome.
- The applicant proposing a Category 1 Digital Planetarium should provide a minimum of 2.0 acres of land, or 1.0 acre if the Planetarium is located inside the Science Centre Campus.
- The applicant proposing a Category 2 Digital Planetarium should provide a minimum of 2.0 acres of land, or 1.0 acre if the Planetarium is located inside the Science Centre Campus.
- The applicant proposing a Category 3 Digital Planetarium should provide a minimum of 1.0 acre of land.
- The applicant may either collocate the Centre with an existing Science Centre, or attach it to one, or set it up independently in another non-formal educational institution which is engaged in science popularization activities.
- The applicant State Government or Union Territory should give a commitment to provide free land and funds as per norms.
- The applicant should employ adequate professional staff for the operation and management of the Digital Planetarium.
- The applicant should obtain all other statutory clearances and approvals required by the local authorities of the Central Government, State Government, Union Territory Government or other bodies.
- The applicant should choose the land in consultation with, and with the approval of, the National Council of Science Museums.
- The applicant should not change the land once offered; if any such incident is noticed after release of grant by the Ministry, the released amount shall be recovered from the organisation with the applicable rate of interest.
- The applicant should provide provisions for the solar rooftop in the Detailed Project Report, which is mandatory for the implementing agency.
- The applicant should ensure that all buildings constructed under the scheme are designed keeping applicable fire safety norms of the location and the National Building Code.
- The applicant should form a Registered Society immediately after the release of the fund by the State Governments or Union Territories towards their share of the capital cost of the project.
- The applicant should sign a Memorandum of Understanding with the National Council of Science Museums for implementation of the project, if undertaken and implemented by the National Council of Science Museums.
Preference, Priority and Relaxation:
- The land requirement is relaxed to 1.0 acre for Category 1 and Category 2 if the Planetarium is located inside the Science Centre Campus.
- The Digital Planetarium is to be preferably co-located in the existing Science Centres, science museums or non-formal education institutions that promote science communication, especially astronomy education.
- Preferably, the State Government, Union Territory, or agency shall undertake the construction of the building within the allocated budget, with inputs and supervision from the National Council of Science Museums.
- The eligibility criteria of population, land, funding pattern, and feasibility and financial viability of the project considering the intangible outcome of the facility in terms of knowledge gain may be relaxed and/or modified in special cases or circumstances by the Honourable Chief Minister, Government of India, as stated in the document.
- In the construction of the building, priority or preference may be given to local material, labour and expertise; wherever possible, community participation may be encouraged; use of renewable energy and energy-saving devices may be given top preference.
- ## 5. किसे नहीं मिलेगा लाभ? (Exclusions)योजना के दिशा-निर्देशों के अनुसार निम्नलिखित श्रेणियों के आवेदक अपात्र माने जा सकते हैं:
निम्नलिखित परिस्थितियों में आवेदन अस्वीकार किया जा सकता है:
- The principal of the corpus fund shall in no case be utilized for any activity.
6. आवेदन के लिए आवश्यक दस्तावेज (Required Documents)
ऑनलाइन आवेदन करने से पहले निम्नलिखित दस्तावेजों की स्पष्ट डिजिटल प्रति तैयार रखें:
- आवेदक का आधार कार्ड (Aadhaar Card)
- मूल निवास प्रमाण पत्र / स्थायी निवासी प्रमाण पत्र (Domicile Certificate)
- खेल / सांस्कृतिक सहभागिता एवं पदक प्रमाण पत्र
- सक्रिय बैंक खाता पासबुक (आधार लिंक, DBT भुगतान हेतु)
- आय प्रमाण पत्र (माता-पिता / आवेदक की वार्षिक आय का प्रमाण)
- जाति प्रमाण पत्र (यदि विशेष आरक्षित वर्ग लाभ हेतु लागू हो)
- पासपोर्ट साइज नवीन फोटोग्राफ एवं मोबाइल नंबर> उपयोगी सुझाव: यदि आपके दस्तावेजों, पहचान पत्रों या फोटो की फाइल साइज पोर्टल पर अपलोड करने के लिए अधिक है, तो आप हमारे मुफ्त PDF Compressor और Image Compressor टूल का उपयोग करके आसानी से फाइल साइज कम कर सकते हैं।
7. ऑनलाइन आवेदन कैसे करें? (Step-by-Step Application Process)
योजना के तहत आवेदन करने की प्रक्रिया निम्नलिखित है:
- Step 1: Determine the Category 1 with a 12 metre dome at a location fulfilling the criteria for Science Centre Category 1, Category 2 with a 10 metre dome at a location fulfilling the criteria for Science Centre Category 2, and Category 3 with an 8 metre dome at a location fulfilling the criteria for Science Centre Category 3, and confirm the land availability of 2.0 acres, 2.0 acres and 1.0 acre respectively, or 1.0 acre for Category 1 and Category 2 if inside the Science Centre Campus.
- Step 2: Decide the funding Type A, Type B (shared 50:50, or 90:10 for the North Eastern Region including Sikkim, with corpus fund 20:80) or Type C (full State funding with technical support against consultancy charges).
- Step 3: Select the land in consultation with, and with the approval of, the National Council of Science Museums; the land cannot be changed later, otherwise the released amount shall be recovered with applicable interest.
- Step 4: Obtain the Detailed Project Report format at Annexure E, with Annexurefor the Physical Report on Site.
- Step 5: Prepare the Detailed Project Report, including the feasibility report, demand survey for the need of the facility at the location, commitment of land free of cost and the recurring cost, projected footfall and expected revenue generation, to determine whether the proposed Digital Planetarium is viable and financially self-sustainable. It will preferably be a hardbound volume in A4 size in portrait alignment; an incomplete Detailed Project Report will render the application liable for rejection.
- Step 6: Attach the mandatory documents, along with the filled Annexurewith Site Map, Google Map and Non-Encumbrance Certificate.
- Step 7: Submit the proposal with the Detailed Project Report to:
_Joint Secretary (Museums)_
_Ministry of Culture, Government of India,_
_Shastri Bhawan, New Delhi-110001_
- Step 8: The proposal shall be considered on the basis of challenge method guidelines, as and when issued by the Government of India, and per the criteria and parameters prescribed for the purpose in the scheme.
- Step 9: The Detailed Project Report will be appraised by the Project Appraisal Committee, comprising the Joint Secretary (Museums), Ministry of Culture; Director or Deputy Secretary (Museums), Ministry of Culture; Representative from the Integrated Finance Division, Ministry of Culture; Director General, National Council of Science Museums; and Director, National Council of Science Museums dealing with the Scheme for Promotion of Culture of Science, for further recommendation to obtain approval of the competent authority.
- Step 10: Obtain approval from the Government of India for setting up the Digital Planetarium under the scheme.
- Step 11: Sign the Memorandum of Understanding between the National Council of Science Museums and the State or Union Territory Government for implementation of the project, if undertaken and implemented by the National Council of Science Museums.
- Step 12: Form the Registered Society immediately after the release of the fund by the State Governments or Union Territories towards their share of the capital cost of the project. A representative of the National Council of Science Museums shall be an ex-officio member of this Society or its Governing Council. The Society shall ensure that the Planetarium functions as per the requirements of its objectives without any deviations. The corpus fund share is released upfront after approval of the project and prior to commencement of the works.
- Step 13: Normally, the digital planetarium will be set up by the National Council of Science Museums on a turnkey basis, and construction shall start only after the share or funding is received from the State or Union Territory Government. Preferably, the construction of the building shall be undertaken by the State Government, Union Territory or agency within the allocated budget as per inputs and supervision by the National Council of Science Museums.
- Step 14: The Registered Society shall complete the recruitment of the required core staff members within 6 months of the release of funds, with the National Council of Science Museums providing professional support to the Executive Council for recruitment and training of staff, the cost of training being borne by the Society. The required staff strength is as follows:
- Category 1 and Category 2, total 6 posts: To be recruited and posted within 3 months after the commencement of the project — Curator or Education Officer, Master of Science (1); Education assistant, Bachelor of Science (1); Lower Division Clerk (1). To be recruited and posted during the installation of the equipment in the planetarium — Technical Assistant, Diploma (1); Technicians, Electronics 1 and Electrical 1 (2).
- Category 3, total 4 posts: To be recruited and posted within 3 months after the commencement of the project — Education Officer, Master of Science, or Education Assistant, Bachelor of Science (1); Lower Division Clerk (1). To be recruited and posted during the installation of the equipment in the planetarium — Technicians, Electronics 1 and Electrical 1 (2).- Security and Conservancy shall be run on contract. The National Council of Science Museums shall provide an organic link for the activities and upgradation, and will train the staff members recruited by the Society for the Centre.
- Step 15: Complete the project within 24 months from the date of issue of the Letter of Intent for the construction work, that is, 24 months from the date of commencement of construction.
- Step 16: Monitoring of Digital Planetariums set up as individual Autonomous Societies under Type B and Type C shall be done by an Executive Council set up by the respective State or Union Territory Government, with due representation from the Ministry of Culture, Government of India, the National Council of Science Museums, the concerned State Government, their private or corporate partners if any, and at least five eminent personalities in the fields of education, Astrophysics, Science and Technology, industry and Science Communication, for recruitment of staff, budgeting, planning and execution of the Annual Plan of activities of the digital planetarium. In case the planetarium is set up in the existing science centres, the existing Executive Council shall monitor the working of the digital planetarium.
- Step 17: The Digital Planetarium or Space and Astronomy Education Centres will be operated and maintained by a Registered Society formed by the State Government for this purpose. The Planetarium shall be run by an agency or society formed for this purpose or by a suitable Society. Over 5 years from opening, it should generate at least 50 per cent of its operating cost, achieve an annual footfall of around 1,00,000 for Category 1 (75,000 for the North East Region), around 75,000 for Category 2 (50,000 for the North East Region) and around 25,000 for Category 3, and organise a minimum of 5 to 10 astronomy education programmes in a year.
Jurisdiction: All disputes arising out of the scheme shall be subject to the jurisdiction of the Courts of Delhi and New Delhi only.
- ## 8. आधिकारिक पोर्टल, हेल्पलाइन नंबर एवं संपर्क सूत्र (Official Contacts)
- आधिकारिक वेबसाइट: culture.gov.in
- राष्ट्रीय सरकारी योजना पोर्टल: myscheme.gov.in
- हेल्पलाइन सहायता: योजना से संबंधित किसी भी पूछताछ, तकनीकी समस्या अथवा आवेदन की स्थिति जानने के लिए आधिकारिक पोर्टल पर दिए गए टोल-फ्री हेल्पलाइन नंबर पर संपर्क करें अथवा संबंधित नोडल कार्यालय से जानकारी लें।
9. अक्सर पूछे जाने वाले सवाल (Frequently Asked Questions - FAQs)
प्र. 1: Scheme for Promotion of Culture of Science: Digital Planetarium/Space And Astronomy Education Centre (Category 1, Category 2 And Category 3) का लाभ किन्हें मिल सकता है?
उत्तर: यह योजना मुख्य रूप से अखिल भारतीय (सभी राज्यों के नागरिक) के लिए संचालित है जो योजना के विहित दिशा-निर्देशों एवं पात्रता शर्तों को पूरा करते हैं।
प्र. 2: Scheme for Promotion of Culture of Science: Digital Planetarium/Space And Astronomy Education Centre (Category 1, Category 2 And Category 3) के लिए आवेदन कैसे किया जा सकता है?
उत्तर: आवेदक आधिकारिक पोर्टल culture.gov.in अथवा संबंधित विभागीय कार्यालय / सीएससी (CSC) केंद्र के माध्यम से ऑनलाइन या ऑफलाइन आवेदन कर सकते हैं।
प्र. 3: क्या योजना के तहत लाभ सीधे बैंक खाते में भेजा जाता है?
उत्तर: हाँ, अधिकांश वित्तीय सहायता एवं सब्सिडी प्रत्यक्ष लाभ अंतरण (DBT) के माध्यम से सीधे लाभार्थी के आधार-लिंक बैंक खाते में भेजी जाती है।
10. निष्कर्ष एवं महत्वपूर्ण सलाह (Conclusion)
Scheme for Promotion of Culture of Science: Digital Planetarium/Space And Astronomy Education Centre (Category 1, Category 2 And Category 3)लक्षित वर्ग के सर्वांगीण विकास एवं कल्याण के लिए एक अत्यंत महत्वपूर्ण और लाभकारी कदम है। सभी पात्र नागरिकों को सलाह दी जाती है कि वे आवश्यक दस्तावेज पहले से तैयार कर आधिकारिक पोर्टल के माध्यम से समय पर अपना आवेदन सुनिश्चित करें।
हमेशा ध्यान रखें कि आवेदन केवल अधिकृत सरकारी पोर्टल के माध्यम से ही करें और किसी भी अज्ञात व्यक्ति या अनधिकृत एजेंट को कोई शुल्क न दें।
अन्य महत्वपूर्ण सरकारी योजनाओं, छात्रवृत्तियों और प्रमाण पत्रों की विस्तृत जानकारी के लिए हमारे सरकारी योजनाएं अनुभाग का अवलोकन करें। साथ ही, प्रतियोगी परीक्षाओं और उच्च शिक्षा की तैयारी हेतु हमारे कोर्स गाइड्स और कॉलेज डायरेक्टरी का लाभ उठाएं।
Check the official source
This service is run by the पर्यटन एवं संस्कृति मंत्रालय, भारत सरकार. Rules, forms, fees and timelines are set by government orders and can change. Always confirm them on the official website, culture.gov.in, before you apply or pay.
Related guides
- दिल्ली में शिक्षा प्राप्त करने वाले छात्रों के लिए छात्रावास सुविधा (HFSAED)इस योजना का उद्देश्य दिल्ली में स्थित उच्च संस्थानों में पढ़ने वाले मध्य प्रदेश के अनुसूचित जात
- अल्पसंख्यक कक्षा 1 से 10 तक की छात्रवृत्ति योजना (MSSC1T10)इस योजना का उद्देश्य उत्तराखंड में किसी भी मान्यता प्राप्त सरकारी/गैर-सरकारी शैक्षणिक संस्थान म
- सांस्कृतिक गतिविधियों में संलग्न संस्थानों और संगठनों को रखरखाव अनुदान (MGIOECA)पुडुचेरी के कला और संस्कृति विभाग द्वारा "सांस्कृतिक गतिविधियों में संलग्न संस्थानों और संगठनों
- लोकप्रसर प्राकल्पो योजना (LPS)राज्य के विभिन्न क्षेत्रों और जिलों में लोक और जनजातीय संस्कृति को उनकी संबंधित शैली में पुनर्ज
- कौशल विकास योजना (पी. बी. ए. ओ. सी. डब्ल्यू. डब्ल्यू. बी.) (SDS-PBAOCWWB)बोर्ड में लाभार्थियों के रूप में नामांकित निर्माण श्रमिकों को प्रशिक्षण प्रदान करने के लिए बोर्
- मेघालय सुग्गर विकास योजना (MPDSC)मेघालय सुग्गर विकास योजना मेघालय सरकार द्वारा शुरू किए गए मुख्यमंत्री के सीएम-एलीवेट कार्यक्रम
- विकलांग व्यक्तियों के लिए सहायता और उपकरणों के लिए वित्तीय सहायता (FAAADP)"विकलांग व्यक्तियों के लिए सहायता और उपकरणों के लिए वित्तीय सहायता" महाराष्ट्र सरकार की एक योजन
- वृध्दा पेंशन योजना (65 वर्ष पूर्ण होने पर)इस योजना का उद्देश्य उत्तराखंड भवन और अन्य निर्माण श्रमिक कल्याण बोर्ड में पंजीकृत निर्माण श्रम
- EWS CertificateCourse guide
- IGRSUPCourse guide
- UP BhulekhCourse guide
This guide is general information compiled by Pratiyogita Kosh. It does not quote fees, stamp duty rates or dates, because they change by order and by year. Confirm all details on the official portal before you act. We are not a government body, we are not affiliated with any department mentioned, and we do not issue certificates or process applications. Beware of agents who ask for money to "speed up" a government service. Sources and review information · Report a correction.

