SSC first · CGL and related exams

SSC · Construction Management practice

Start with free questions. Take a timed mock. Find your weak topics and build a practice session to improve them.

Previous-year papers · timed practice

English SSC CGL Tier I papers. Free 60-minute mocks, 100 questions, 200 marks; +2 correct and −0.5 incorrect. Source: SSC response sheets preserved by SSC Portal. The marked archived keys have not been independently revalidated against final SSC keys; worked explanations are pending review. A/B/C/D correspond to source options 1/2/3/4.

Choose your next topic

These topics contain published free SSC questions. Counts reflect the selected language and paper filters. Archived papers show their source and key status above.

Civil Engineering (SSC JE)

Building Materials

1456 free questions →
Civil Engineering (SSC JE)

Concrete Technology and RCC

1120 free questions →
Civil Engineering (SSC JE)

Construction Management

560 free questions →
Civil Engineering (SSC JE)

Environmental Engineering

896 free questions →
Civil Engineering (SSC JE)

Estimating, Costing and Valuation

672 free questions →
Civil Engineering (SSC JE)

Fluid Mechanics and Hydraulics

1008 free questions →
Civil Engineering (SSC JE)

Hydrology and Irrigation

896 free questions →
Civil Engineering (SSC JE)

Soil Mechanics and Foundations

896 free questions →
Civil Engineering (SSC JE)

Steel Structures

560 free questions →
Civil Engineering (SSC JE)

Strength of Materials and Structural Analysis

1568 free questions →
Civil Engineering (SSC JE)

Surveying

784 free questions →
Civil Engineering (SSC JE)

Transportation Engineering

784 free questions →
Electrical Engineering (SSC JE)

Analog and Digital Electronics

896 free questions →
Electrical Engineering (SSC JE)

Basic Electrical Engineering

1344 free questions →
Electrical Engineering (SSC JE)

Circuit Theory and Networks

1568 free questions →
Electrical Engineering (SSC JE)

Control Systems

672 free questions →
Electrical Engineering (SSC JE)

Electrical Machines

2016 free questions →
Electrical Engineering (SSC JE)

Electrical Measurements and Instruments

1120 free questions →
Electrical Engineering (SSC JE)

Electromagnetism and Magnetic Circuits

448 free questions →
Electrical Engineering (SSC JE)

Power Electronics and Drives

672 free questions →
Electrical Engineering (SSC JE)

Power Systems

1568 free questions →
Electrical Engineering (SSC JE)

Signals and Systems

448 free questions →
Electrical Engineering (SSC JE)

Utilization of Electrical Energy

448 free questions →
English Language

Grammar and Vocabulary

2028 free questions →
English Language

SSC PYQ - English Language

469 free questions →
English Language

Vocabulary

13736 free questions →
General Awareness

Environment and Ecology

330 free questions →
General Awareness

General Science

2983 free questions →
General Awareness

Geography

1921 free questions →
General Awareness

History and Culture

5348 free questions →
General Awareness

Indian Economy

1313 free questions →
General Awareness

Indian Polity and Governance

3105 free questions →
General Awareness

SSC PYQ - General Awareness

343 free questions →
General Awareness

Science and Technology

495 free questions →
General Awareness

Static GK

9055 free questions →
Mechanical Engineering (SSC JE)

Engineering Mechanics

448 free questions →
Mechanical Engineering (SSC JE)

Fluid Mechanics and Machines

1568 free questions →
Mechanical Engineering (SSC JE)

Heat Transfer

672 free questions →
Mechanical Engineering (SSC JE)

IC Engines

672 free questions →
Mechanical Engineering (SSC JE)

Industrial Engineering, Metrology and Materials

448 free questions →
Mechanical Engineering (SSC JE)

Machine Design

896 free questions →
Mechanical Engineering (SSC JE)

Manufacturing and Production Engineering

1344 free questions →
Mechanical Engineering (SSC JE)

Power Plant Engineering

896 free questions →
Mechanical Engineering (SSC JE)

Refrigeration and Air Conditioning

672 free questions →
Mechanical Engineering (SSC JE)

Strength of Materials

1120 free questions →
Mechanical Engineering (SSC JE)

Theory of Machines

1120 free questions →
Mechanical Engineering (SSC JE)

Thermodynamics

1344 free questions →
Quantitative Aptitude

Algebra

2879 free questions →
Quantitative Aptitude

Arithmetic

12630 free questions →
Quantitative Aptitude

Averages

1748 free questions →
Quantitative Aptitude

Data Interpretation

1225 free questions →
Quantitative Aptitude

Interest

3311 free questions →
Quantitative Aptitude

Percentage

2781 free questions →
Quantitative Aptitude

Profit and Loss

3224 free questions →
Quantitative Aptitude

Ratio and Proportion

2202 free questions →
Quantitative Aptitude

SSC PYQ - Quantitative Aptitude

295 free questions →
Reasoning Ability

Analogy

666 free questions →
Reasoning Ability

Blood Relations

499 free questions →
Reasoning Ability

Calendar and Clock

498 free questions →
Reasoning Ability

Classification

665 free questions →
Reasoning Ability

Coding-Decoding

666 free questions →
Reasoning Ability

Direction Sense

499 free questions →
Reasoning Ability

Logical Reasoning

21002 free questions →
Reasoning Ability

Mathematical Operations

499 free questions →
Reasoning Ability

Number Series

11308 free questions →
Reasoning Ability

Number and Letter Series

833 free questions →
Reasoning Ability

Ranking and Order

333 free questions →
Reasoning Ability

SSC PYQ - Reasoning Ability

356 free questions →
Reasoning Ability

Statement and Conclusion

333 free questions →
Reasoning Ability

Syllogism

499 free questions →

Try a free practice session

No account needed. This session stays in this browser tab; sign in for timed tests, bookmarks and saved performance.

Question 1 · Civil Engineering (SSC JE) · Construction Management
PERT uses time estimates which are
Choose your answer for question 1
Answer and explanation

Correct answer: C

PERT is probabilistic. Each activity has optimistic (to), most likely (tm) and pessimistic (tp) times.

Question 2 · Civil Engineering (SSC JE) · Construction Management
In PERT, an activity has optimistic, most likely and pessimistic times of 4, 6 and 14 days. Its expected time is
Choose your answer for question 2
Answer and explanation

Correct answer: A

te = (to + 4tm + tp)/6 = (4 + 24 + 14)/6 = 42/6 = 7 days.

Question 3 · Civil Engineering (SSC JE) · Construction Management
The activities on the critical path have a total float of
Choose your answer for question 3
Answer and explanation

Correct answer: B

Critical activities have no slack, so any delay in them delays the whole project.

Question 4 · Civil Engineering (SSC JE) · Construction Management
The bar chart in project planning was introduced by
Choose your answer for question 4
Answer and explanation

Correct answer: B

Gantt charts show activities as bars against a time scale. They do not show interdependencies as clearly as network methods.

Question 5 · Civil Engineering (SSC JE) · Construction Management
In a lump-sum contract, the contractor agrees to
Choose your answer for question 5
Answer and explanation

Correct answer: D

The owner knows the total cost up front, and any change in scope is handled by a variation order.

Question 6 · Civil Engineering (SSC JE) · Construction Management
Crashing of a project network means
Choose your answer for question 6
Answer and explanation

Correct answer: C

The cheapest activities on the critical path are shortened step by step until the target duration is met or no further reduction is possible.

Question 7 · Civil Engineering (SSC JE) · Construction Management
Earnest money is a deposit taken from a tenderer
Choose your answer for question 7
Answer and explanation

Correct answer: A

It is returned to unsuccessful bidders and is converted into part of the security deposit for the successful bidder.

Question 8 · Civil Engineering (SSC JE) · Construction Management
An event in a PERT network is
Choose your answer for question 8
Answer and explanation

Correct answer: A

Events are shown as nodes. Activities are the arrows that consume time.

Question 9 · Civil Engineering (SSC JE) · Construction Management
For an activity, EST = 5, EFT = 9 and LFT = 14 (days). The total float is
Choose your answer for question 9
Answer and explanation

Correct answer: C

Total float = LFT − EFT = 14 − 9 = 5 days.

Question 10 · Civil Engineering (SSC JE) · Construction Management
For hauling and spreading earth over medium distances, the most suitable machine is a
Choose your answer for question 10
Answer and explanation

Correct answer: C

A scraper excavates, hauls and spreads in one cycle. Draglines and clamshells dig and place within their reach.

Question 11 · Civil Engineering (SSC JE) · Construction Management
In a PERT network, an activity has optimistic, most likely and pessimistic times of 2, 6 and 16 days. The expected time is
Choose your answer for question 11
Answer and explanation

Correct answer: D

te = (to + 4tm + tp)/6 = (2 + 24 + 16)/6 = 7 days.

Question 12 · Civil Engineering (SSC JE) · Construction Management
A project needs an investment of ₹10 lakh and gives a net annual benefit of ₹5 lakh. The simple payback period is
Choose your answer for question 12
Answer and explanation

Correct answer: B

Payback = investment / annual net benefit = 10/5 = 2 years.

Question 13 · Civil Engineering (SSC JE) · Construction Management
A work of 300 units is to be done by labourers each completing 8 units per day. With 8 labourers working together, the time required is
Choose your answer for question 13
Answer and explanation

Correct answer: A

Man-days = 300/8 = 37.5. Days = 37.5/8 = 4.7.

Question 14 · Civil Engineering (SSC JE) · Construction Management
A project needs an investment of ₹50 lakh and gives a net annual benefit of ₹4 lakh. The simple payback period is
Choose your answer for question 14
Answer and explanation

Correct answer: C

Payback = investment / annual net benefit = 50/4 = 12.5 years.

Question 15 · Civil Engineering (SSC JE) · Construction Management
The planned quantity of work up to a date is 25 units and 10 units have been completed. The percentage of planned progress achieved is
Choose your answer for question 15
Answer and explanation

Correct answer: C

Progress = 10/25 × 100 = 40 percent.

Question 16 · Civil Engineering (SSC JE) · Construction Management
An excavator has a bucket capacity of 1.25 m³, a bucket fill factor of 0.85, a cycle time of 25 seconds and a job efficiency of 0.8. Its hourly output is about
Choose your answer for question 16
Answer and explanation

Correct answer: A

Output = (3600/cycle) × capacity × fill factor × efficiency = (3600/25) × 1.25 × 0.85 × 0.8 = 122.4 m³/h.

Question 17 · Civil Engineering (SSC JE) · Construction Management
An activity costs ₹50000 in the normal time of 12 days and ₹60000 when crashed to 9 days. The cost slope per day is
Choose your answer for question 17
Answer and explanation

Correct answer: D

Cost slope = (crash cost − normal cost)/(normal time − crash time) = (60000 − 50000)/(12 − 9) = ₹3333 per day.

Question 18 · Civil Engineering (SSC JE) · Construction Management
A PERT activity has an optimistic time of 6 days and a pessimistic time of 15 days. Its variance is
Choose your answer for question 18
Answer and explanation

Correct answer: A

σ = (tp − to)/6 = (15 − 6)/6 = 1.5. Variance = σ² = 2.25.

Question 19 · Civil Engineering (SSC JE) · Construction Management
A PERT activity has an optimistic time of 6 days and a pessimistic time of 18 days. Its standard deviation is
Choose your answer for question 19
Answer and explanation

Correct answer: B

σ = (tp − to)/6 = (18 − 6)/6 = 2. Variance = σ² = 4.

Question 20 · Civil Engineering (SSC JE) · Construction Management
A machine costs ₹60,00,000, has a salvage value of ₹5,00,000 and a service life of 15000 hours. The straight line depreciation per operating hour is
Choose your answer for question 20
Answer and explanation

Correct answer: B

Depreciation per hour = (6000000 − 500000)/15000 = ₹366.67.

Answer the 20 questions, then check your score.